Paving and Sidewalk Construction for FY22 Fitchburg

Paving and Sidewalk Construction for FY22

DPW received and accepted bids for paving of roadways during FY22. Sidewalk construction bids were completed in March and construction is underway. The following projects total $1.7 Million and are currently procured and funded:

1. Summer Street – from Moran Square to Harvard Street (1/2 mile). Project will replace and construct sidewalks and ADA ramps on both sides of the roadway with tree pits installed where possible. Roadway will be milled and repaved. Construction of sidewalks to start next week. Total cost approximately $650,000 funded through Chapter 90 and a $20,000 grant from Greening the Gateway Cities.

2. Oak Hill Road – from Franklin Road to Sarah Lane (1.15 miles). Project will Cold-Inplace-Recycle 5-inches of asphalt with a microsurfacing. This is the same process that was done last year on Crawford Street. DPW crews are also replacing and constructing new culverts, catch basins, and drainage swales to alleviate the flooding issues. Total cost is approximately $300,000 funded completely with City capital funds thanks to the support of the Mayor and City Council.

3. Williams/McIntire/Alpine Roads – from Ashburnham Hill Road to about #200 Alpine Road (1.5 miles). The project will completely reconstruct the roadway by full-depth reconstruction and adding 4-inches of asphalt on top. Total cost is approximately $650,000 funded through Chapter 90.

4. Electric Avenue Crosswalks – Crosswalks with flashing pedestrian signs across Electric Avenue at the Knights of Columbus and at Mt. Elam Road. ADA ramps and crosswalks across Forest Hill, Milk, and Mallard Drive. Total cost is approximately $100,000 funded through a Complete Streets grant and Chapter 90.

5. Perkins Street – Full-depth reconstruction and pavement in coordination and financial support from redevelopment of Conquest Video.

pavement milling.JPG

CAUGHT...reporting city issues! =)

While I was out putting out more SAM signs on lawns... a homeowner stopped me on the street and asked if I could help get this DEAD tree 🌳 taken care of... while I was reporting it the fabulous Real Estate 🏘 Photographer Jermane Stephinger caught me in action with this candid photo 😎
Here's a picture of the tree in question...and a few other city issues I saw along the way to report to my favorite city officials to fix 🚧 STOP sign upsidedown or POTS sign rightsideup? 😁
#councilorduties #campaignduties #dualduty #alwaysworking

CRACKSealing! More preventative ROAD Maintenance!

CRACKSealing! More preventative ROAD Maintenance being done in FitchburgMass.
Roadways throughout the city received preventative maintenance this past week in the form of crack cleaning and sealing.
By filling pavement cracks, water and debris is prevented from entering into the pavement and subbase, thereby extending the pavement life for about five to seven years. The work is being paid from the MassDOT Chapter 90 account.
Superior Sealcoating, Inc.has a $75,000 budget with 8000 gallons of sealant! They have completed approx 22% of the work so far and will continue to work throughout the city in the coming week.

Micro-surfacing coming SOON!

Micro-surfacing coming SOON!
The micro-surfacing project will apply two thin 3/8 inch layers of polymer-modified asphalt emulsion and aggregate pavement to seal and smooth out the roadways. This micro-surface extends the life of a roadway for seven to nine years. The following roadways will be scheduled for the micro-surfacing treatment in the end of August.
1️⃣ Rindge Rd (remainder) length: 4873’ cost: $95,235
2️⃣ Cortland Ave length: 675’ cost: $14,951
3️⃣ MacIntosh Ln length: 1240’ cost: $30,397
4️⃣ Broad St 1183’ length: cost: $27,481
5️⃣ Upham St length: 1620’ cost: $32,833
6️⃣ Skyview Dr length: 580’ cost: $10,735
Total Microsurfacing: $211,632

Paving list coming soon... Streetscan analyzing streets at over 60% complete.

68922729_2789111474433762_4669203799548624896_o.jpg