Micro-surfacing coming SOON!
The micro-surfacing project will apply two thin 3/8 inch layers of polymer-modified asphalt emulsion and aggregate pavement to seal and smooth out the roadways. This micro-surface extends the life of a roadway for seven to nine years. The following roadways will be scheduled for the micro-surfacing treatment in the end of August.
1️⃣ Rindge Rd (remainder) length: 4873’ cost: $95,235
2️⃣ Cortland Ave length: 675’ cost: $14,951
3️⃣ MacIntosh Ln length: 1240’ cost: $30,397
4️⃣ Broad St 1183’ length: cost: $27,481
5️⃣ Upham St length: 1620’ cost: $32,833
6️⃣ Skyview Dr length: 580’ cost: $10,735
Total Microsurfacing: $211,632
Paving list coming soon... Streetscan analyzing streets at over 60% complete.