🚧🚦River st and Wallace Rd Traffic LIGHT Update from DPW:
DPW Engineering and the FPD reviewed operations at the signalized intersection of Wallace Road and River Street. Our contractor, Pine Ridge Technologies (PRT), met with us at the intersection to review proposed changes to the phasing of the signal. In order to relieve congestion, the River Street traffic will have concurrent phasing – meaning both approaches will have a green light at the same time. The video detection will be realigned to serve only Wallace Road approach and the commercial driveway at the drycleaners. This means that River Street traffic will always have the green light until a vehicle is ‘seen’ by the cameras on Wallace Road or at the commercial driveway, at which time the traffic signal will give red lights to both River Street approaches and green light to the Wallace Road approach. The pedestrian signal will continue to be an exclusive phase – meaning when the ped button is pushed, all vehicle approaches will receive a red light and the pedestrian(s) will be free to cross in any direction.